How long does solar panel installation take in Watford?

The programme is set after a survey, because scaffolding, roof access and system size vary from house to house. Paperwork often sets the order of work. A system within G98, up to and including 16 A per phase (3.68 kW single-phase or 11.04 kW three-phase), is notified to the network operator within 28 days after commissioning, but a larger system goes through G99 before installation, and MCS says adding a battery to solar is likely to exceed 16 A per phase. On a flat roof in a conservation area, an array also needs an application to the council for a prior approval determination before work starts.

More About Solar in Watford

SOLA UK are MCS-certified solar panel installers for Watford, working from our office at Arquen House, 4-6 Spicer Street, St Albans. We install solar PV, battery storage and EV chargers for homes and ...

View Watford Solar Guide
Get Expert Advice

Still Have Questions?

Our local Hertfordshire team can answer any questions about solar panels for your property. Get a free, no-obligation consultation.

  • Free site survey
  • Personalised system design
  • Fixed-price quote

Related Questions